This and That

I spent a good chunk of this week visiting my Mom in Wisconsin, so not much sewing was accomplished.

I was asked how I would add the triangles to my leader/ender project. I figured a picture was the easiest way to explain. I hope this helps. Eventually, I will add a triangle to the end of each strip as shown, the. Sew the strips together.

I completed my second block for the Humble Quilts Welcome QAL.

While in Wisconsin, we visited the cemetery. This is the grave of my paternal grandparents.

I think this detail would make a lovely quilting design.

E3 got a new construction worker outfit that he is pretty pleased about!

I left these two hooligans home this time. I sure missed them!

Have a great day!

Advertisement

About katyquilts

I am a wife, mom of four amazing adult kids, and a former librarian. I love making everything from traditional quilts to art quilts. I am thankful to God my Father and Creator for the gift of creativity!
This entry was posted in Uncategorized. Bookmark the permalink.

2 Responses to This and That

  1. lois92346 says:

    I’m glad you got to spend time with your mom. The pups are so adorable! E3 is growing so fast! I can already picture him as a young man. If you haven’t already sewed the triangles to the rows, think about this: switch the bottom two on the left with the top two on the right. That way the stripes will be going in the same direction on the left (opposed to those on the right).

  2. johannes123qqq says:

    I like your leader/ender project ;autum is starting: good to start new projects.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s