Today the link ups are starting for the Finish A Long 2014 over at The Littlest Thistle. So if you signed up, don’t forget to add your links! There are some great prizes out there for finishes. I originally had 5 things on my list to finish this quarter. I finished a lot more than that but for me this was about finishing some long standing UFOs. Here is my original post.
I made my March list fairly short, knowing I would spend half the month in Arizona. Here is the list:
1. Compete the March challenge quilt for the SQT group. Done! Finished the binding on the way to Arizona!
2. Complete a QOV for the HMQS Quilting Treasures challenge. Done and mailed out last Friday.
3. Make crib skirt, bumper pads, crib sheets, and quilt for baby Q’s baby shower. The crib skirt, bumper pads, and sheet are done. Now to make a quilt to match.
4. Finish the last 20 Album blocks. I think I made 5 this month and am plenty bored with them!
April goals:
1. Baby quilt to match the rest of the bedding.
2. Finish shirting quilt.
3. SQT Challenge quilt.
4. Make 3 presentation cases for QOVs and label all three.
5. Finish the album blocks.
6. Remake the March SQT challenge quilt in vintage fabrics.
I also need to set my Quarter 2 FAL Goals. These will again be long standing UFOs that need to get done. Hmmmm….the album quilt might find a spot here!
Linking up with Lily for Fresh Sewing Day.





Congrats on your progress and finishes 🙂
looks like you made great progress on your goals – good luck with April’s 🙂
Oh how I love that SQT quilt (what is SQT?). I just love the triangles and the fabrics! You are so busy, so productive. I feel like such a slacker. Ha!
You did very well in the month of March considering you were gone much of the time. It was time well spent I might add. It looks like you have some lofty goals for April (which I have no doubt you’ll accomplish). I’m envious of your stamina. You go, Girl!